Goodwe GW10KT-DT 620V mains inverter

1,690.00 
1,361.00  Excluding VAT
1,687.64  Includes VAT

Goodwe GW10KT-DT 620V network inverter for interconnected net metering system

Available on backorder

  ... people are viewing this right now

  Share

Goodwe GW10KT-DT 620V mains inverter

Goodwe GW10KT-DT 620V-inverter-diktyou-net-metering, prices, offers, purchase, net metering PPC, HEDNO

Goodwe GW10KT-DT 620V-inverter-diktyou-net-metering, prices, offers, purchase, net metering PPC, HEDNO

The Goodwe GW10KT-DT 620V (+ DC-Switch / Wifi), 2-MPPT Series Goodwe SDT G2 Inverter PV, is one of the best available options in the home and business sector. Due to its technical characteristics, which make it one of the best converters on the market.

50% oversized DC input and 10% AC output overload, drive this converter to its full capacity by adding extra reflections from the back of the panels to increase your output power in low sunlight conditions.

With its high performance of 98,3%, improved overclocking and overload capabilities and the fact that it does not require a zero line for installation, the SDT G2 is the best choice in the market.

Built-in reverse current

In areas where solar power is not allowed in the grid, installers can easily set an export limit via the GoodWe app with a single click, as the SDT G2 has a built-in reversing function in the inverter.

Arc circuit breaker-Error

Safety first! With AFCI, the inverter is able to detect arc failure by sending alerts through monitoring systems and interrupting the circuit at the same time. GoodWe offers not only efficiency, reliability, but also security.

AC Output

Rated AC power: 10kW
Maximum AC power: 11kVA

DC input

Rated DC power: 15kWp

Maximum Voltage: 1000V

Dimensions: 354 * 433 * 155 mm

Weight: 16kg

5 year warranty

  1. What is energy offset (net metering); 

Energy offset means offsetting the energy injected into Network energy from a power plant with the absorbed energy in the consumption plant of the autoproducer. It concerns a production station which is installed in the same or adjacent space with the consumption installation, which is connected to the distribution network through the same supply. In energy offset, the energy produced does not have to be synchronized with the energy consumed.

 

The terms and conditions for the development of production stations with energy offset were initially determined by ΥΑ ΑΠΕΗΛ / Α / Φ1 / οικ.24461 (Government Gazette Β '3583 / 31.12.2014), which was subsequently abolished and replaced by ΥΑ ΑΠΕΗΛ / Α / Φ1 /οικ.175067 (Government Gazette Β '1547 / 5.5.2017), which was recently abolished and replaced by ΥΑ No. YPEN / DAPEEK / 15084/382 (Government Gazette B '759 / 5.3.2019).

 

  1. At what power limits is the development of power plants by energy offset generators in the Interconnected System applied?

 

In Interconnected System (mainland and its interconnected islands):

 

a) The power of each power plant can be up to 20 kW or up to 50% of the agreed power of the consumption plant (in kVA), if the last size exceeds 20 kW.

 

b) Especially for self-generating MTs as well as for self-generating stations regardless of the tendency of connection by legal entities of public or private law pursuing public or other public interest purposes, general or local scope, the power of each generating station can be up to 100% of the agreed power consumption.

Most viewed products

Recently viewed products

Goodwe GW10KT-DT 620V, prices, discounts, appliances,

Goodwe GW10KT-DT 620V, prices, discounts, appliances,

Goodwe GW10KT-DT 620V, prices, offers, discounts, devices 2022-2023. Buy online now from our store, easily and quickly.

My cart
Close Wishlist
Close Recently Viewed
Compare Products (0 Products)
Compare Products
Compare Products
Compare Products
Compare Products
Category