Autonomous photovoltaic system for refrigerator 12V / 65watt - 75 watts
Autonomous photovoltaic kit / package for small refrigerator 65-75 watt / 12V or 220V by adding inverter
Goodwe GW17KN-DT 1000V network inverter for interconnected net metering systems
Available on backorder
The Goodwe GW17KN-DT 1000V (+ DC-Switch / Wifi), 2-MPPT Series Goodwe SDT G2 XNUMX-phase Photovoltaic Inverter is one of the best available options in the home and business sector. Due to its technical characteristics, which make it one of the best converters on the market.
50% oversized DC input and 10% AC output overload, drive this converter to its full capacity by adding extra reflections from the back of the panels to increase your output power in low sunlight conditions.
With its high performance of 98,3%, improved overclocking and overload capabilities and the fact that it does not require a zero line for installation, the SDT G2 is the best choice in the market.
In areas where solar power is not allowed on the grid, installers can easily set an export limit via the GoodWe app with a single click, as the SDT G2 has a built-in reverse current function in the inverter.
Safety first! With AFCI, the inverter is able to detect arc failure. Sending alerts via monitoring systems and disconnecting the circuit at the same time. GoodWe offers not only efficiency, reliability, but also security.
Rated AC power: 17kW
Maximum AC power: 19kVA
Rated DC power: 22.1kWp
Dimensions: 516 * 455 * 220mm
Weight: 26kg
5 year warranty
Energy offset means offsetting the energy injected into Network energy from a power plant with the absorbed energy in the consumption plant of the autoproducer. It concerns a production station which is installed in the same or adjacent space with the consumption installation, which is connected to the distribution network through the same supply. In energy offset, the energy produced does not have to be synchronized with the energy consumed.
The terms and conditions for the development of production stations with energy offset were initially determined by ΥΑ ΑΠΕΗΛ / Α / Φ1 / οικ.24461 (Government Gazette Β '3583 / 31.12.2014), which was subsequently abolished and replaced by ΥΑ ΑΠΕΗΛ / Α / Φ1 /οικ.175067 (Government Gazette Β '1547 / 5.5.2017), which was recently abolished and replaced by ΥΑ No. YPEN / DAPEEK / 15084/382 (Government Gazette B '759 / 5.3.2019).
In Interconnected System (mainland and its interconnected islands):
a) The power of each power plant can be up to 20 kW or up to 50% of the agreed power of the consumption plant (in kVA), if the last size exceeds 20 kW.
b) Especially for self-generating MTs as well as for self-generating stations regardless of the tendency of connection by legal entities of public or private law pursuing public or other public interest purposes, general or local scope, the power of each generating station can be up to 100% of the agreed power consumption.